Pre-Excavation Trench Scan — 1,200ft Corridor
Mechanical contractor needed a 1,200ft × 15ft trench corridor scanned before excavation. Located electric, telecom, and unknown utilities at varying depths — all marked APWA on-site and mapped in the deliverable before the first shovel.