Services Why Us How It Works Projects Coverage Blog Call 480-454-1894
Call 480-454-1894
GPR Scanning · Phoenix, Arizona

PHOENIX
CONCRETE
SCANNING

Across the Valley, even ground-floor slabs are often post-tensioned. We map the tendons, rebar, conduits, and private utilities before you core, saw, anchor, or trench.

1000+
Projects Completed
99%
Detection Accuracy
24hr
Report Turnaround
⚡ THE REAL COST OF SKIPPING A SCAN
✕
Without GPR
  • 💥
    Hit Post-Tension Cable
    $15,000+
  • ⏱
    2-Week Site Shutdown
    Schedule blown
  • ⚡
    Cut Electrical Conduit
    $4,000+
  • 💧
    Damaged Water Line
    $10,000–$25,000
  • ⚖️
    Liability & Legal Exposure
    Unpredictable
Avg. Risk: $15,000+
✓
With GPR
  • 📍
    Every PT Cable Located
    Marked on slab
  • ✅
    Project Stays on Schedule
    Zero stoppages
  • 📄
    PDF Report in 24 Hours
    Ready for your crew
  • 🎯
    99% Detection Accuracy
    Drill with confidence
  • 🛡
    Full Liability Protection
    Documentation on file
Starting at $500
Call 480-454-1894 — Book Your Scan

OUR
SERVICES

From a plumbing core through a post-tensioned slab in Scottsdale to a full private-utility map on a Mesa industrial site, we give your crew the data before the first cut.

01
CONCRETE SCANNING

We locate and layout rebar, post-tension cables, conduits, and voids before any drilling or cutting begins — clear accurate markings left on-site, backed by a same-day PDF project summary report with field photos, findings, and marked safe-drill zones.​​​​​​​​​​​​​​​​

02
UTILITY LOCATING

Underground gas, electric, water, sewer, and telecom — located with GPR, APWA color-coded, and marked on-site ahead of any trenching or excavation. Every locate comes with a same-day scaled utility map, KML file, and our project summary report.

03
DRILL CREW COORDINATION

Need Coring or Cutting? We connect you with a vetted local crew from our partner network — no vendor hunting on your end. Our partnership volume means better pricing than going direct, and we handle the scheduling. One call gets you the scan, the report, and the drill crew lined up.​​​​​​​​​​​​​​​​

COMPLETED
PROJECTS

Recent work from our Salt Lake City and Nashville teams. Same GPR equipment, same on-slab markings, same 24-hour reports we bring to every Arizona job.

Red post-tension tendon and yellow rebar markings on a slab underside - Salt Lake City project
Concrete Scanning · Salt Lake City

PT Ceiling Scan Before Heavy Anchoring

A restaurant contractor needed to hang a 4-ton kitchen vat from a post-tensioned deck. Our scan showed several of the planned anchor holes landing directly on tendons. They were shifted into clear concrete before drilling started.

Scope: PT deck scan, 3 anchor areas

WE PROTECT
YOUR PROJECT

01
99% Detection Accuracy

Our GPR equipment and interpretation protocols consistently identify rebar, conduits, and tension cables — even in thick or congested concrete slabs, and any underground utilities.

02
Reports in 24 Hours

You get a full PDF drill guide or utility report & KML Map delivered within 24 hours — so your schedule doesn't slip waiting on data.

03
On-Site Chalk Markings

We mark every finding directly on the slab with color-coded chalk so your driller has clear guidance at the hole — not just on paper.

04
$500–$2,000 vs. $50,000+

A scan costs a fraction of what a hit cable, broken conduit, or cut rebar costs. One job saved pays for years of scanning.

AVERAGE DAMAGE COST BY TYPE
Hit Post-Tension Cable $40–$80K
Cut Electrical Conduit $15–$30K
Damaged Water Line $10–$25K
Rebar Breach + Delay $5–$15K
GRT Scan Cost $500–$2K
PROTECT YOUR PROJECT
Scanning starts at $500. Request a callback today.
Call 480-454-1894

SIMPLE.
FAST. RELIABLE.

01
Request a Scan

Call or submit a request online. We confirm your job details, address, and scanning needs — usually same or next-day scheduling.

02
We Scan On-Site

Our tech arrives with GPR equipment, scans the defined areas, and marks all findings directly on the slab with color-coded chalk.

03
Report Delivered

A full PDF report — findings summary, scan photos, slab data, and drill guidance — lands in your inbox within 24 hours.

04
Project Moves Forward

Your crew drills, cuts, or trenches with full confidence. No surprises, no stoppages, no expensive damage.

WHAT OUR
CLIENTS SAY

"

Safety is our top priority. Their GPR services gave us the exact data needed to ensure our concrete drilling was safe and fully compliant. No surprises, no accidents.

J
John D.
Site Supervisor
"

We've faced major delays before due to undetected rebar. With GRT, we avoided any surprises and had smooth, on-time project completion. Professional from start to finish.

D
David P.
Project Manager

SERVING
ARIZONA
CONTRACTORS

From our Phoenix-metro base we work with GCs, plumbers, electricians, fire protection crews, and excavation companies, from tenant improvements in Scottsdale to the industrial and tech buildout in north Phoenix, Mesa, and Chandler.

Phoenix metro: Phoenix, Scottsdale, Tempe, Mesa, Chandler, Gilbert, Glendale, Peoria, Surprise, Goodyear, Avondale, Buckeye, Queen Creek, San Tan Valley, Maricopa, Casa Grande, Fountain Hills, Cave Creek, Paradise Valley, Apache Junction.
Statewide: Tucson, Flagstaff, Yuma, Prescott, Prescott Valley, Lake Havasu City, Sierra Vista, Bullhead City, Sedona, Kingman.
New Mexico: Albuquerque, Santa Fe, Las Cruces, and statewide.

Post-Tension Slabs
Semiconductor & Tech
Data Centers
Industrial & Warehouse
Multifamily
Tenant Improvements
Solar & EV Charging
Private Utilities
GET IN TOUCH
Phone
480-454-1894
Hours
Mon–Fri 7am–6pm
Primary Market
Phoenix Metro, Arizona & New Mexico

FREQUENTLY
ASKED

How much does concrete scanning cost in Phoenix?

Most Phoenix-area scans start at $500 and run $500 to $2,000, depending on how many areas we scan and how busy the slab is. Repairing a cut post-tension tendon or conduit commonly runs $10,000 to $80,000.

Are slabs in Phoenix usually post-tensioned?

Very often, yes. Expansive clay soils across the Valley make post-tensioned slab-on-grade the standard foundation for many homes, warehouses, and commercial buildings. That means even a ground-floor core for a plumbing or electrical remodel can hit a tendon. Scan before you drill.

Doesn't Arizona 811 already mark the utilities?

Arizona 811 notifies utility companies, who mark the lines they own, typically up to the meter. Privately owned lines on your side of the meter, such as site lighting, irrigation mainlines, sewer laterals, and feeds to outbuildings, aren't marked. We locate and mark those private lines with GPR. You still need to contact Arizona 811 at least two working days before digging.

What areas in Arizona do you serve?

We're based in the Phoenix metro and cover the whole Valley, including Phoenix, Scottsdale, Tempe, Mesa, Chandler, Gilbert, Glendale, Peoria, Surprise, Goodyear, Buckeye, and Queen Creek, plus Tucson, Flagstaff, Yuma, Prescott, and Lake Havasu City. We also take projects across New Mexico.

How quickly do you deliver scan reports?

Findings are marked on the concrete or ground while we scan, so your crew can keep working. The full PDF drill guide or utility report follows within 24 hours.

What is APWA color coding for utility locating?

APWA (American Public Works Association) color codes standardize how underground utilities are marked: red for electric, orange for telecom, yellow for gas, blue for drinking water, green for sewer, purple for reclaimed water and irrigation, pink for temporary survey marks, and white for the proposed dig area. All of our utility reports follow these standards.

New to scanning? Read our guide: Concrete Scanning Before Core Drilling or Saw Cutting: Why It Matters

READY TO SCAN YOUR SITE?
Call 480-454-1894